After writing out my script I hired to camera to do some filming. The only night that everyone was free it happened to be raining which was unfortunate but we had to go with it. This resulted in some of the opening sequences to be quite quiet to try and get rid of the background noise.
- 211 (18)
- DMDN (13)
- cinematics (10)
- design (9)
- Cake (6)
- ProjectThree (6)
- perspective (5)
- Filming (4)
- ProjectTwo (4)
- editing (4)
- feet (4)
- ground (4)
- websites (4)
- Iterations (3)
- Rendering (3)
- Zombies (3)
- blogs (3)
- public domain (3)
- 104 (2)
- Sound (2)
- Tunnels (2)
- UT2004 (2)
- composition (2)
- 461 (1)
- Article (1)
- Bribery (1)
- Echoes (1)
- Fail (1)
- Light (1)
- Movement (1)
- Remix (1)
- Shadow (1)
- fucking external (1)
- loss of work (1)
- not cool. (1)
- sources (1)
0 comments:
Post a Comment